Workforce and Capacity
Our workforce grows with the size of the project; your work does not wait.
Güvengrup Yapı has a core staff of around 150 people. Together with project crews, at least 350 people work on our sites, and across concurrent projects this number has reached 500. We have 5 engineers and at least 100 workers holding the Turkish MYK scaffolding erector certificate, field teams in Hatay, Bursa and Çanakkale, and scaffolding stock that covers more than 100,000 square meters of facade at the same time.

How the workforce grows with the project
On large projects we size the team to the quantities and the program. When we plan the team for a project, we look at:
- Type and size of the work: facade area, number of floors or the size of the steel structure
- Program and handover date
- Project location and site access
- Our other jobs running in the same period
Team structure on site
| Role | What they do on site |
|---|---|
| Engineers | Prepare the static calculation and erection plan for scaffolding, and the structural calculation and shop drawings for steel. We have 5 engineers and add more when a project requires it. |
| Site engineer | Stays on site from erection to dismantling on scaffolding jobs, inspects the finished scaffold and releases it for use. |
| Foremen | Lead the erection and assembly crews on site. |
| Erection and assembly crews | Erect and dismantle scaffolding and erect steel structures. At least 100 of our workers hold the MYK scaffolding erector certificate. |
| Welders | Certified welders carry out welding and assembly work on site. |
| Shipyard team | A separate team for shipyard and shipbuilding work, independent from the construction crews. It grows to 70 people depending on the job and consists of welders, grinders and fitters. |
Teams in three provinces, work across Türkiye and abroad
Our field teams are based in Hatay, Bursa and Çanakkale. We work on sites in different provinces in the same period and mobilize to provinces where we have no team. We can also mobilize crews for projects abroad; see our service areas page.
On the public rebuilding projects in the Hatay earthquake zone, we scaffolded all buildings at the same time instead of moving material from building to building. Both the material and the erection and dismantling labor were ours.
Equipment and material
- Scaffolding material. Galvanized steel scaffolding in frame (H-type), ringlock, cuplock and tube-and-coupler systems, plus mobile (rolling) scaffolding. The stock in our warehouses covers more than 100,000 square meters of facade at the same time. Our rental material holds a TS EN 12810-1 conformity certificate; working platforms, guardrails, intermediate rails and toe boards are part of the rental set.
- Cranes and manlifts. Our own machines and partner companies, with outside support in busy periods.
- Steel fabrication. Fabrication is carried out at partner fabrication shops holding TS EN 1090 certification, execution class EXC2; erection is done by our own crews. Project management, engineering and quality control stay with us.
Certificates
We hold TSE and ISO certificates, welder certificates and occupational health and safety documents. We share details and copies during the quote or tender process.
Mobilization
Thanks to the size of our workforce, your work does not wait. For a new job, in any province, we follow the same steps: site survey, team and material plan, mobilization with crew and material to your program. The exact start date is agreed with you at the survey and quote stage.
To let us plan the team correctly, include the number of buildings and facades, the number of floors or approximate quantities, the start date and the estimated duration in your request. Request a quote.
Frequently asked questions
How many people does Güvengrup Yapı employ?
Our core staff is around 150 people. Together with project crews, at least 350 people work on our sites, and across concurrent projects this number has reached 500. The team includes 5 engineers and at least 100 workers holding the MYK scaffolding erector certificate.
Can you run several sites at the same time?
Yes. With field teams in Hatay, Bursa and Çanakkale, we work on sites in different provinces in the same period, and our workforce grows with the size of the jobs. Every scaffolding site has a site engineer in addition to the foremen.
How much scaffolding material do you hold?
The scaffolding material in our warehouses covers more than 100,000 square meters of facade at the same time. It is galvanized steel in frame (H-type), ringlock, cuplock and tube-and-coupler systems, plus mobile (rolling) scaffolding; our rental material holds a TS EN 12810-1 conformity certificate.
Do you own cranes and manlifts?
We use our own machines and partner companies for cranes and manlifts, with outside support in busy periods. In steel construction quotes where we take fabrication and erection together, transport, erection and crane are included as standard.
Which certificates does the company hold?
We hold TSE and ISO certificates, welder certificates and occupational health and safety documents. Our partner fabrication shops for steel hold TS EN 1090 certification with execution class EXC2. Copies are available during the tender process.