Skip to content
Menu

Steel Construction Contractor in Türkiye

Warehouses, hangars, factory buildings and mezzanines: engineering, fabrication, erection and project management in one hand.

Güvengrup Yapı builds steel warehouses, hangars, factory buildings and mezzanine floors across Türkiye. Fabrication is carried out at partner fabrication shops holding TS EN 1090 certification (execution class EXC2); erection is done by our own crews; structural design, shop drawings, project management and quality control stay with us. We work as a subcontractor or on a turnkey basis.

Representative image: Havadan görünüm: yol kenarındaki şantiyede çelik taşıyıcı sistemi kurulan iki depo binası ve bir mobil vinç

What we build

  • Warehouses and hangars. Steel load-bearing structures for logistics and storage warehouses, industrial warehouses and hangars.
  • Factory buildings. Production halls with administrative sections and room for future expansion.
  • Mezzanine floors and additional storeys. Steel mezzanines in warehouses, factories and commercial buildings; additional steel storeys on suitable buildings.
  • Subcontracted steel erection. Our own erection crews for main contractors and general contractors.

Who does what

Every steel structure goes through four stages: design, fabrication, erection and inspection. When you compare quotes from steel contractors, we suggest asking who carries out each stage and under which certificate. Here is how the work is divided with us.

Stage Who does it
Project management Güvengrup Yapı
Structural design and shop drawings Our engineers
Fabrication Partner fabrication shops holding TS EN 1090 certification, execution class EXC2
Fabrication quality control Güvengrup Yapı
Erection Our own erection crews
Inspection and handover Güvengrup Yapı

A problem in fabrication and a problem in erection are solved with the same contact. You do not carry the coordination load between a fabricator and an erector.

How a project runs

  1. Site survey. We visit the site and work out the purpose, dimensions and program of the building with you.
  2. Design and engineering. Our engineers prepare the structural calculation and the shop drawings.
  3. Fabrication. Steel members are fabricated at partner fabrication shops; we follow fabrication and carry out quality control.
  4. Transport and erection. Members arrive on site in erection sequence; our own crews erect them. Cranes and manlifts come from our own machines and from partner companies, with outside support in busy periods.
  5. Inspection and handover. We complete post-erection inspections and hand over the structure.

Standards and certificates

  • Fabrication and erection of steel structures in Türkiye follow TS EN 1090-2. The TS EN 1090 certificate belongs to the fabricating shop; our partner fabrication shops hold it with execution class EXC2.
  • Our welders hold welder certificates for site welding.
  • We hold TSE and ISO certificates and occupational health and safety documents. Copies are available during the tender process.

Safety during erection

The main risks in steel erection are work at height and lifting. We plan the erection sequence and the lifting points before work starts; nobody works under a suspended load. Everyone working at height uses a helmet and a safety harness. Where welding at height is required, the working platform is fitted with guardrails and toe boards.

Capacity

Our core staff is around 150 people; together with project crews, at least 350 people work on our sites. We have 5 engineers and add more when a project requires it. Team structure and equipment are on our capacity page. If your project also needs scaffolding, see our scaffolding page.

What we need for a quote

  • Project location (country, city or province)
  • Type and purpose of the building (warehouse, hangar, factory, mezzanine, additional storey)
  • Approximate floor area, span and height
  • Scope: erection only, fabrication and erection, or turnkey
  • Architectural or structural drawings and site photos, if available
  • Planned start date and program

We respond to quote requests within 24 hours. Request a quote.

Frequently asked questions

Where is the steel fabricated?

Steel members are fabricated at our partner fabrication shops, which hold TS EN 1090 certification with execution class EXC2. We follow the fabrication and carry out quality control; erection is done by our own crews.

Do you work as a steel erection subcontractor?

Yes. We supply steel erection crews to main contractors and general contractors as a subcontractor. We can also take fabrication, erection and project management together, or the whole job on a turnkey basis.

Who prepares the structural design?

Our own engineers prepare the structural calculation and the shop drawings. Engineering is included in our quotes.

What is included in a steel construction quote?

When we take fabrication and erection together, engineering, painting, transport, erection and crane are included as standard. Whether foundations, anchor bolts and the ground slab are included depends on the project and is stated separately in the quote.

What determines the price of a steel structure?

The steel tonnage, the span and height of the structure, the snow, wind and seismic loads at the site, connection details, painting or galvanizing, roof and wall cladding, the site location and the program. We do not publish fixed prices; we prepare a quote for your project.

Which certificates do you hold?

We hold TSE and ISO certificates, welder certificates and occupational health and safety documents. Our partner fabrication shops hold TS EN 1090 certification with execution class EXC2. Copies are available during the tender process.

Request a quote

We reply to quote requests within 24 hours.

Fill in the form or contact us directly.

Four details are enough: your name, phone number, the service you need and the project location.

We reply to quote requests within 24 hours.

To attach files or add details, use the full quote form.